Pavement Condition Report 2026
Riverton maintains 96 centerline miles of streets. The citywide weighted Pavement Condition Index is 66 (Fair),
up from 63 in 2024, largely because of the 2025 Main Street resurfacing. Holding PCI at 66 requires about $3.1
million a year; current funding averages $2.2 million, a five-year gap of $4.5 million. Michael Bell, Director of
Public Works
Condition categories
PCI range
Condition
Share of network
86100
Very good
18%
7185
Good
29%
5170
Fair
31%
2650
Poor
17%
025
Failed
5%
Arterial and collector segments
Street
Limits
Length (ft)
PCI
Recommended treatment
Main St
Station Ave to Mill St
5,810
88
None (resurfaced 2025)
Elm St
Oak Ave to Cedar Ln
2,940
41
Mill and overlay
Oak Ave
Main St to Lakeview Blvd
4,120
63
Slurry seal
Harbor Way
Riverbend Dr to city limit
3,380
52
Mill and overlay
Riverbend Dr
Harbor Way to Willow St
2,760
71
Crack seal
Cedar Ln
Elm St to Granite Way
1,850
34
Reconstruction
Fremont Ave
Main St to Old Town Rd
3,090
77
Crack seal
Old Town Rd
Fremont Ave to Mill St
2,210
58
Slurry seal
Lakeview Blvd
Oak Ave to Station Ave
4,460
82
None
Willow St
Riverbend Dr to Elm St
1,620
46
Mill and overlay
Granite Way
Cedar Ln to city limit
2,480
29
Reconstruction
Station Ave
Lakeview Blvd to Main St
1,970
69
Slurry seal
Pothole reports can be filed on the City's service request portal; crews patch reported potholes within five working days on average.